the period of time between the backup and the server crashing. Since this morning's news, we have deployed a new dedicated server, and we are in the process of configuring it and loading the backup. The good news is that we have a safe backup. I sure wish I would have known that Sunday or Monday!Īnyway, with that news, we decided to put our contingency plans into effect immediately. I'm afraid that we do not have an ETA for repair at this time." So it will need to be physically inspected before it can be powered on. "Unfortunately, this server appears to be in the section with a high probability of water damage. Unfortunately, that bit of info caused us to stand by and wait for our current server to get turned back on, which we hoped would be imminently.Īs it turns out, there was more water damage at the data center than originally let on, and this morning we received the message: News from the datacenter was slim, except to tell us that they were awaiting a city inspector on Monday to approve turning the power back on. On Easter Sunday, the data center where our server is located suffered:īackup generators to deploy, which causedĪ fire in one of the backup generators, which caused
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
March 2023
Categories |